ISSN 1507-2711
JOURNAL DOI: dx.doi.org/10.17531/ein
Our IF is 1.383
JCR Journal Profile


Członek(Member of): Europejskiej Federacji Narodowych Towarzystw Eksploatacyjnych  - European Federation of National Maintenance Societies  Wydawca(Publisher):Polskie Naukowo-Techniczne Towarzystwo Eksploatacyjne (Warszawa) - Polish Maintenance Society (Warsaw)   Patronat Naukowy(Scientific supervision): Polska Akademia Nauk o/Lublin  - Polish Akademy of Sciences Branch in Lublin  Członek(Member of): Europejskiej Federacji Narodowych Towarzystw Eksploatacyjnych  - European Federation of National Maintenance Societies

 


Publisher:
Polish Maintenance Society
(Warsaw)

Scientific supervision:
Polish Academy of Sciences Branch in Lublin

Member of:
European Federation
of National Maintenance Societies


Attention!

In accordance with the requirements of citation databases, proper citation of publications appearing in our Quarterly should include the full name of the journal in Polish and English without Polish diacritical marks, i.e. "Eksploatacja i Niezawodnosc – Maintenance and Reliability".


 

Submission On-Line

 




 

Impact Factor

Impact Factor

Impact Factor

SCImago Journal & Country Rank

MOST CITED

Update: 2018-11-13

1. ON APPROACHES FOR NON-DIRECT DETERMINATION OF SYSTEM DETERIORATION
By: Valis, David; Koucky, Miroslav; Zak, Libor

EKSPLOATACJA I NIEZAWODNOSC-MAINTENANCE AND RELIABILITY
Issue: 1   Pages: 33-41   Published: 2012

Times Cited: 45
2. COMPUTER-AIDED MAINTENANCE AND RELIABILITY MANAGEMENT SYSTEMS FOR CONVEYOR BELTS
By: Mazurkiewicz, Dariusz

EKSPLOATACJA I NIEZAWODNOSC-MAINTENANCE AND RELIABILITY
Volume: 16   Issue: 3   Pages: 377-382   Published: 2014

Times Cited: 35
3. A NEW FAULT TREE ANALYSIS METHOD: FUZZY DYNAMIC FAULT TREE ANALYSIS
By: Li, Yan-Feng; Huang, Hong-Zhong; Liu, Yu; et al.

EKSPLOATACJA I NIEZAWODNOSC-MAINTENANCE AND RELIABILITY
Issue: 3 Pages: 208-214 Published: 2012

Times Cited: 32
4. UTILIZATION OF DIFFUSION PROCESSES AND FUZZY LOGIC FOR VULNERABILITY ASSESSMENT
By: Valis, David; Pietrucha-Urbanik, Katarzyna

EKSPLOATACJA I NIEZAWODNOSC-MAINTENANCE AND RELIABILITY
Volume: 16   Issue: 1   Pages: 48-55   Published: 2014

Times Cited: 30
5. MAINTENANCE DECISION MAKING BASED ON DIFFERENT TYPES OF DATA FUSION
By: Galar, Diego; Gustafson, Anna; Tormos, Bernardo; et al.
EKSPLOATACJA I NIEZAWODNOSC-MAINTENANCE AND RELIABILITY 
Issue: 2   Pages: 135-144   Published:2012

Times Cited: 28
6. PREDICTING THE TOOL LIFE IN THE DRY MACHINING OF DUPLEX STAINLESS STEEL
By: Krolczyk, Grzegorz; Gajek, Maksymilian; Legutko, Stanislaw

EKSPLOATACJA I NIEZAWODNOSC-MAINTENANCE AND RELIABILITY
Volume: 15 Issue: 1 Pages: 62-65 Published: 2013

Times Cited: 28
7. SELECTED ASPECTS OF PHYSICAL STRUCTURES VULNERABILITY - STATE-OF-THE-ART
By: Valis, David; Vintr, Zdenek; Malach, Jindrich

EKSPLOATACJA I NIEZAWODNOSC-MAINTENANCE AND RELIABILITY
Issue: 3 Pages: 189-194 Published: 2012

Times Cited: 26
8. RELIABILITY BASED OPTIMAL PREVENTIVE MAINTENANCE POLICY OF SERIES-PARALLEL SYSTEMS
By: Peng Wei; Huang Hong-Zhong; Zhang Xiaoling; et al.

EKSPLOATACJA I NIEZAWODNOSC-MAINTENANCE AND RELIABILITY
Issue: 2 Pages: 4-7 Published: 2009

Times Cited: 24
9. DIAGNOSTIC OF DIRECT CURRENT MACHINE BASED ON ANALYSIS OF ACOUSTIC SIGNALS WITH THE USE OF SYMLET WAVELET TRANSFORM AND MODIFIED CLASSIFIER BASED ON WORDS
By: Głowacz Adam

EKSPLOATACJA I NIEZAWODNOSC-MAINTENANCE AND RELIABILITY
Volume: 16   Issue: 4   Pages: 554-558   Published: 2014

Times Cited: 23
10. MODELLING OF PASSIVE VIBRATION DAMPING USING PIEZOELECTRIC TRANSDUCERS - THE MATHEMATICAL MODEL
By: Buchacz, Andrzej; Placzek, Marek; Wrobel, Andrzej

EKSPLOATACJA I NIEZAWODNOSC-MAINTENANCE AND RELIABILITY
Volume: 16   Issue: 2   Pages: 301-306   Published: 2014

Times Cited: 23

 

Visits since 2016.06.29:
darmowe liczniki



Task „Implementation of procedures ensuring  the originality of scientific papers published in the quarterly „Eksploatacja i Niezawodność – Maintenance and Reliability” financed under contract 532/P-DUN/2018 from the funds of the Minister of Science and Higher Education for science dissemination activities.


Methodology for enhancing reliability of predictive project schedules in construction

Metodyka zwiększenia niezawodności predyktywnych harmonogramów realizacji przedsięwzięć budowlanych

 

Full text: 

Abstract: 

Construction projects consist in providing new built facilities as well as in maintaining the existing building stock. Reliability engineering in construction encompasses all stages of the structure’s life cycle from the earliest concept of the project to decommissioning. The project planning and design stages are aimed at selecting or creating technical and organisational solutions to assure that the built facility meets the sponsor’s and the user’s requirements; these requirements regulate also the construction process. The result of planning the construction process should be a reliable schedule – immune to disruptive effects of random occurrences, so assuring high probability of the actual processes meeting their predefined deadlines. A practical method of scheduling construction projects should enable the planner to generate schedules resistant to random occurrences, making them reliable so that the users can meet deadlines. The paper presents a proactive methodology for generating construction schedules of enhanced reliability. The methodology covers two fundamental stages. The first stage is a construction duration risk assessment based on a multi-attribute evaluation of operating conditions. The second stage is the allocation of time buffers. An original methodology supporting decisions at each stage is put forward, namely a methodology for evaluating process duration risk level, defining significance of operating conditions, estimating dispersion of process durations, and defining criticality of processes in the schedule. The author proposes a set of measures of schedule robustness to serve as surrogate criteria in the schedule instability cost minimization problem and buffer sizing. The proposed way of allowing for risk and uncertainty in creating reliable schedules is argued to be efficient in protecting the project completion date, as well as stage or even process start dates, against disruptions.

Streszczenie: 

Przedsięwzięcia budowlane obejmują swym zakresem procesy związane z wznoszeniem nowych obiektów, jak i utrzymaniem istniejących zasobów. Inżynieria niezawodności w budownictwie obejmuje wszystkie fazy cyklu życia obiektu budowlanego, od przygotowania koncepcyjnego po jego likwidację. Na etapie planowania i projektowania jest dokonywany dobór rozwiązań technicznych i organizacyjnych, które zapewnią spełnienie wymagań stawianych przez inwestora i użytkownika, w tym również w odniesieniu do fazy realizacji obiektu. Rezultatem projektowania przebiegu realizacji przedsięwzięcia powinien być niezawodny harmonogram o wysokim prawdopodobieństwie dotrzymania zaplanowanych terminów i małej wrażliwości na wpływ zjawisk losowych. W artykule zaprezentowano proaktywne podejście metodyczne do projektowania predyktywnych harmonogramów realizacji przedsięwzięć budowlanych, w celu zwiększenia ich niezawodności. Obejmuje ono dwa zasadnicze etapy: ocenę ryzyka czasu realizacji procesów budowlanych w oparciu o wieloatrybutową ocenę warunków realizacyjnych oraz alokację buforów czasu w harmonogramie. Opracowano oryginalną metodykę wspomagającą podejmowanie decyzji na każdym etapie tej procedury, tj. metodykę oceny poziomu ryzyka czasu realizacji procesów, określania istotności warunków realizacyjnych, dyspersji czasu realizacji procesów budowlanych i krytyczności procesów w harmonogramowaniu predyktywnym. Zaproponowano zestaw mierników odporności harmonogramu, stanowiących zastępcze kryteria w problemie minimalizacji kosztu niestabilności i określania wielkości buforów czasu. Proponowane ujęcie uwzględnienia warunków ryzyka w harmonogramach predyktywnych zwiększa ich niezawodność i zapobiega dezaktualizacji terminu końcowego oraz terminów realizacji poszczególnych procesów lub etapów przedsięwzięcia.

Pages: 

470–479

DOI: 10.17531/ein.2015.3.20

Article citation info: 
Jaśkowski P. Methodology for enhancing reliability of predictive project schedules in construction. Eksploatacja i Niezawodnosc – Maintenance and Reliability 2015; 17 (3): 470–479, http://dx.doi.org/10.17531/ein.2015.3.20.