ISSN 1507-2711
JOURNAL DOI: dx.doi.org/10.17531/ein

JCR Journal Profile


Członek(Member of): Europejskiej Federacji Narodowych Towarzystw Eksploatacyjnych  - European Federation of National Maintenance Societies  Wydawca(Publisher):Polskie Naukowo-Techniczne Towarzystwo Eksploatacyjne (Warszawa) - Polish Maintenance Society (Warsaw)   Patronat Naukowy(Scientific supervision): Polska Akademia Nauk o/Lublin  - Polish Akademy of Sciences Branch in Lublin  Członek(Member of): Europejskiej Federacji Narodowych Towarzystw Eksploatacyjnych  - European Federation of National Maintenance Societies

 


Publisher:
Polish Maintenance Society
(Warsaw)

Scientific supervision:
Polish Academy of Sciences Branch in Lublin

Member of:
European Federation
of National Maintenance Societies


Attention!

In accordance with the requirements of citation databases, proper citation of publications appearing in our Quarterly should include the full name of the journal in Polish and English without Polish diacritical marks, i.e. "Eksploatacja i Niezawodnosc – Maintenance and Reliability".


 

Submission On-Line

 





MOST CITED

Update: 2019-11-17

1. ON APPROACHES FOR NON-DIRECT DETERMINATION OF SYSTEM DETERIORATION
By: Valis, David; Koucky, Miroslav; Zak, Libor

EKSPLOATACJA I NIEZAWODNOSC-MAINTENANCE AND RELIABILITY
Volume 14, Issue: 1   Pages: 33-41   Published: 2012

Times Cited: 51
2. COMPUTER-AIDED MAINTENANCE AND RELIABILITY MANAGEMENT SYSTEMS FOR CONVEYOR BELTS
By: Mazurkiewicz, Dariusz

EKSPLOATACJA I NIEZAWODNOSC-MAINTENANCE AND RELIABILITY
Volume: 16   Issue: 3   Pages: 377-382   Published: 2014

Times Cited: 48
3. A NEW FAULT TREE ANALYSIS METHOD: FUZZY DYNAMIC FAULT TREE ANALYSIS
By: Li, Yan-Feng; Huang, Hong-Zhong; Liu, Yu; et al.

EKSPLOATACJA I NIEZAWODNOSC-MAINTENANCE AND RELIABILITY
Volume 14, Issue: 3 Pages: 208-214 Published: 2012

Times Cited: 43
4. PREDICTING THE TOOL LIFE IN THE DRY MACHINING OF DUPLEX STAINLESS STEEL
By: Krolczyk, Grzegorz; Gajek, Maksymilian; Legutko, Stanislaw

EKSPLOATACJA I NIEZAWODNOSC-MAINTENANCE AND RELIABILITY
Volume: 15 Issue: 1 Pages: 62-65 Published: 2013

Times Cited: 33
5. UTILIZATION OF DIFFUSION PROCESSES AND FUZZY LOGIC FOR VULNERABILITY ASSESSMENT
By: Valis, David; Pietrucha-Urbanik, Katarzyna

EKSPLOATACJA I NIEZAWODNOSC-MAINTENANCE AND RELIABILITY
Volume: 16   Issue: 1   Pages: 48-55   Published: 2014

Times Cited: 32
6. MAINTENANCE DECISION MAKING BASED ON DIFFERENT TYPES OF DATA FUSION
By: Galar, Diego; Gustafson, Anna; Tormos, Bernardo; et al.
EKSPLOATACJA I NIEZAWODNOSC-MAINTENANCE AND RELIABILITY 
Volume 14, Issue: 2   Pages: 135-144   Published:2012

Times Cited: 32
7. APPLICATION OF NEURAL RECONSTRUCTION OF TOMOGRAPHIC IMAGES IN THE PROBLEM OF RELIABILITY OF FLOOD PROTECTION FACILITIES
By: Rymarczyk, Tomasz; Klosowski, Grzegorz

EKSPLOATACJA I NIEZAWODNOSC-MAINTENANCE AND RELIABILITY
Volume: 20 Issue: 3 Pages: 425-434 Published: 2018

Times Cited: 30
8. RECOGNITION OF ARMATURE CURRENT OF DC GENERATOR DEPENDING ON ROTOR SPEED USING FFT, MSAF-1 AND LDA
By: Glowacz, Adam; Glowacz, Witold; Glowacz, Zygfryd

EKSPLOATACJA I NIEZAWODNOSC-MAINTENANCE AND RELIABILITY
Volume: 17 Issue: 1 Pages: 64-69 Published: 2015

Times Cited: 28
9. TESTS OF EXTENDABILITY AND STRENGTH OF ADHESIVE-SEALED JOINTS IN THE CONTEXT OF DEVELOPING A COMPUTER SYSTEM FOR MONITORING THE CONDITION OF BELT JOINTS DURING CONVEYOR OPERATION
By: Mazurkiewicz, Dariusz

EKSPLOATACJA I NIEZAWODNOSC-MAINTENANCE AND RELIABILITY
Issue: 3 Pages: 34-39 Published: 2010

Times Cited: 28
10. MODELLING OF PASSIVE VIBRATION DAMPING USING PIEZOELECTRIC TRANSDUCERS - THE MATHEMATICAL MODEL
By: Buchacz, Andrzej; Placzek, Marek; Wrobel, Andrzej

EKSPLOATACJA I NIEZAWODNOSC-MAINTENANCE AND RELIABILITY
Volume: 16   Issue: 2   Pages: 301-306   Published: 2014

Times Cited: 27

 



Task „Implementation of procedures ensuring  the originality of scientific papers published in the quarterly „Eksploatacja i Niezawodność – Maintenance and Reliability” financed under contract 532/P-DUN/2018 from the funds of the Minister of Science and Higher Education for science dissemination activities.


Aleksandar Đ. BRKIĆ

Diagnostyka właściwości dynamicznych wysięgnika zrzutowego koparki kołowej oraz jego przebudowa

W artykule badano możliwe przyczyny złych własności dynamicznych wysięgnika zrzutowego koparki kołowej C7OOS (BWE) pracującej w kopalni odkrywkowej Kolubara w Serbii. Do stworzenia modelu konstrukcji nośnej wysięgnika zrzutowego oraz przeprowadzenia obliczeń statycznych i dynamicznych wykorzystano metodę elementów skończonych (MES). Model został następnie zweryfikowany przy użyciu metody eksperymentalnej – analizy drgań. Wyznaczone cele osiągnięto poprzez analizę wyników MES, które zostały następnie zweryfikowane w badaniach doświadczalnych. Ustalono przyczyny słabego działania wysięgnika. Głównymi problemami eksploatacyjnymi okazały się być nieodpowiednia konstrukcja cięgien wysięgnika oraz montaż kabiny kierowcy. Aby poprawić charakterystyki pracy wysięgnika, rozważono możliwe opcje jego przebudowy. Wybór metody przebudowy ograniczały zasoby techniczne i finansowe użytkownika maszyny. Przebudowa dała poprawę charakterystyk pracy wysięgnika, co wykazano w praktyce.

Diagnostics of bucket wheel excavator discharge boom dynamic performance and its reconstruction

The paper focuses on an investigation into the possible causes of the bad dynamic performance of bucket wheel excavator C7OOS (BWE) discharge boom in the Kolubara opencast mine, Serbia. A discharge boom load carrying structure model was produced and its static and dynamic calculations were made by the finite element method (FEM). The model was then validated by the experimental method – vibration analysis. The set goals were achieved by the FEM result analysis, which were further confirmed in the experiment. The causes for discharge boom weak performance were established. The main operation problems were found in the inadequate design of the discharge boom tie(s) and the subsequent installation of a steering cabin. Possible discharge boom reconstructions were considered with a view to improving its operation performance. The selection of the reconstruction approach was limited by the technical and financial resources available to the machine users. After the completed reconstruction, the discharge boom improved operation performance was demonstrated in practice.